Projects
National and international
Hydraulic and Irrigation
Package of Mini Hydroelectric Power Plants – Prodeis Norte
Supervision of works.
Study of the Hydroenergetic Potential of the San Gabán River
Development of a hydroelectric exploitation scheme consisting of four jumps with a net fall of 2,535 m.
Mollepata Hydroelectric Power Plant
Feasibility study. It will use the waters from the second tunnel of the Mantaro hydroelectric complex.
San Gaban III Hydroelectric Power Plant
Service for the development of the study at the pre-feasibility level of the San Gabán III Hydroelectric Power Plant.
Technical evaluation of adduction works
Evaluation of operating conditions of the driving tunnel and penstock.
San Gaban II Hydroelectric Power Plant
Engineering studies, designs and development.