Projects
National and international
Hydraulic and Irrigation
Topo Hydroelectric Power Plant
Supervision of the execution of civil works, transmission line, substation, transportation, assembly of mechanical equipment and electrical equipment of CH Topo.
Charcani V Hydroelectric Power Plant
Supervision of construction of the second and last phase. Design review. Detailed engineering of some structures.
240 MW Cañón del Pato Hydroelectric Plant
Study and Works Supervision
Hydroelectric Power Plant 140 MW Machu Picchu
Study, Design and Engineering Development
San Gabán Hydroelectric Power Plant
Automation of the San Gabán I and San Gabán II Power Plants and their respective Substations.