Projects
National and international
Mining and Industry
Primary Crushing Plant – Tintaya Mine
Ultimate engineering. Change of higher capacity shaker and new design.
Cerro Verde II Expansion
Detail engineering. Comprehensive designs: structural, mechanical, electrical, piping, sanitary and instrumentation.
Impulse Lines – Toquepala Mine
Studies, designs, engineering development. PLS drive system.
Chilca I Thermal Power Plant
Transportation of desalinated water to the Chilca I Thermal Power Plant and the brine return emitter system to the sea.
Marañón metallurgical mining complex
Pre-feasibility study of own hydroelectric supply: Marañón WT hydroelectric plant.
Cerro Lindo Project
Final engineering and technical file. Geotechnical studies, topography, archeology and easement.