Drinking Water and Sewerage of the Quebrada de Manchay

Lima


Study, design and engineering development.

definitive study.

  • Conjunctive use of drinking water, drilling of 5 wells, 5 pumping stations.
  • 11 new reservoirs.
  • 18 km of impulse lines from 60 to 400 mm in diameter.
  • 9 km of transmission lines from 90 to 600 mm in diameter.
  • 18 km of main collectors from 200 to 900 mm in diameter.
  • Wastewater treatment plant of 275 l/s on average and maximum hourly 420 l/s.