Expansion of the Toquepala Concentrator Plant

Moquegua


Feasibility study, basic engineering, detailed engineering and supply management (procurement).

New 40,000 tpd copper concentrator plant, separate from the current one. Including molybdenum plant and a filter plant, with contact areas with the existing concentrator. Includes transport of tailings and shipment of concentrates.

  • Primary crushing design.
  • 2.3 km tunnel with conveyor belt for the crushed material to the bulk pile.
  • Molybdenum flotation plant.
  • Concentrate and tailings thickeners.
  • Filtration plant for copper and molybdenum concentrates.
  • Electric system.
  • Water supply system.
  • Access roads and auxiliary facilities.