240 MW Cañón del Pato Hydroelectric Plant
Ancash
Study and Works Supervision.
Participation in the design and supervision of phase I of the repowering and expansion to 240 MW. Three-phase project that included:
-
- Six 40 MW units.
- New intake of 72 m3/s.
- Extension of the existing sand trap.
- 3.0 km bypass tunnel.
- Headrace tunnel of 9.5 km.