Hydroelectric Power Plant 140 MW Machu Picchu

Cusco


Study, Design and Engineering Development

Study and definition of rehabilitation alternatives for the main and auxiliary equipment of the two powerhouses.

Definition of expansion to 140 MW, 50 m3/s. Design of complementary civil works: intake, adduction tunnel expansion, modifications in powerhouses.

Basic investigations:

    • Structural geology.
    • Presence of landslides in the Aobamba River.
    • Methodology for the design of rock support.
    • Maintenance of the second stage of the powerhouse.