Mollepata Hydroelectric Power Plant
Huancavelica
Feasibility study. It will use the waters from the second tunnel of the Mantaro hydroelectric complex. Definition of equipment and civil works.
- 4 Pelton turbines.
- Net drop 1060 m.
- Flow: 64 m3/s.
- Pressure tunnel 2 km long and 5 m in diameter.
- Power house in cavern.