Mollepata Hydroelectric Power Plant

Huancavelica


Feasibility study. It will use the waters from the second tunnel of the Mantaro hydroelectric complex. Definition of equipment and civil works.

  • 4 Pelton turbines.
  • Net drop 1060 m.
  • Flow: 64 m3/s.
  • Pressure tunnel 2 km long and 5 m in diameter.
  • Power house in cavern.