Building Tower 3 Leed
Lima
Work was carried out in the pre-construction, construction and post-construction stages.
8 basement levels and 12 upper levels 3 commercial areas in the first 2 upper floors and the 10 upper floors have administrative offices.
-
- Built area: 50,100 m2.