Stabilizer Block 88. Las Malvinas


Basic and detailed engineering. Project to control humidity in the bottom product of the stabilizer, reducing the humidity contained in the propane stream to 10 ppm of free water; action prior to the shipment of LNG through the pipeline from the Las Malvinas field, in the jungle, to the Pisco Separation Plant, on the coast.

Control achieved by interchanging filter systems:

  • Disassembly of the filter/coalescer and reinstallation in the stabilization system.
  • Installation of a vertical separating filter (Aquasep-plus) in the place left by the existing system.