Package of environmental impact studies of road works

(Español) Perú


EIA of the definitive study of the rehabilitation of the Chongoyape – Cajamarca 320 km highways; Lambayeque-Piura 254 km; Detour Tocache – Tocache 126 km; highways JBIC Project PE-22: Ricardo Palma – La Oroya – Huancayo, Cruce Olmos – Corral Quemado, Huaura – Sayán – Churín, Chamaya – San Ignacio, Jauja Tarma, with a total length of 527 km; etc.

Verification of the existence of adequate lines and minimization of negative effects during construction, operation and maintenance.