Mass Transit Electric System Line 1 Preliminary Stage of the Lima Metro

Lima


Supervision of the first civil works of the Lima Metro: earthworks, formwork, reinforcement, columns and viaduct of the section between Calle 3 (Surquillo) and Av. J. Prado (San Borja).

    • Length: 3 km.
    • elevated road.
    • Track width: 8.40 m.
    • Average clearance: 5 m.