Installation of Drinking Water and Drainage Systems
Arequipa
Preparation of the technical file of the work.
-
- Topographic study.
- Study of soil mechanics and geotechnics.
- Drinking water system design.
- Potable water treatment plant, Q=190 lps.
- Sewage system design.
- Wastewater treatment plant, Q=160 lps activated sludge technology.
- Structural, electromechanical and electrical supply design.
- Environmental impact assessment study and construction budget.