Junction Works of the Driving Line to Reservoirs
Lima
Definitive design including study of economic profitability, social evaluation and environmental impact, beneficiary population: 75,000 inhabitants. North Sector of Lima.
- Design of 11 drinking water reservoirs, between 150 m3 and 1000 m3 each.
- Improvement of pumping systems of 11 existing reservoirs. 30 km of impulse lines with diameters between 80 mm and 400 mm.
- For interconnection with existing infrastructure. 7 km of pipe for primary collectors with a diameter between 200 and 400 mm; 130 drainage boxes from 1.20 to 4 m deep.