Andalusian Plant
Piura
Construction supervision and assembly of the 60,000 t/year Andalusian non-metallic mineral concentrator plant.
- Detailed design and construction supervision of the treated water pumping system.
- 2 pumping stations.
- 6″ HDPE line, 15 km.