Andalusian Plant

Piura


Construction supervision and assembly of the 60,000 t/year Andalusian non-metallic mineral concentrator plant.

  • Detailed design and construction supervision of the treated water pumping system.
  • 2 pumping stations.
  • 6″ HDPE line, 15 km.