Ammonium Nitrate Plant
Study, design and engineering development.
Basic engineering of OBL facilities, phase FEL 3.
-
- Preparation of preliminary design documentation, floor plans, meters for all connections with the ENERSUR power plant.
- Preliminary design of the highway road crossing for access to the new plant and pipeline crossing of the Costanera Sur highway (Tacna – Ilo).
- Review of plans, electrical designs, reliability of power supply.
- Study for the location of the plant and depth of the pipe (32”) by GPR method.
- Sampling of the dust in the environment of the Orica terrain.
- Provision of baseline meteorological information for the plant site.