Ammonium Nitrate Plant


Study, design and engineering development.

Basic engineering of OBL facilities, phase FEL 3.

    • Preparation of preliminary design documentation, floor plans, meters for all connections with the ENERSUR power plant.
    • Preliminary design of the highway road crossing for access to the new plant and pipeline crossing of the Costanera Sur highway (Tacna – Ilo).
    • Review of plans, electrical designs, reliability of power supply.
    • Study for the location of the plant and depth of the pipe (32”) by GPR method.
    • Sampling of the dust in the environment of the Orica terrain.
    • Provision of baseline meteorological information for the plant site.