Taboada Wastewater Treatment Plant
Lima
Study, design and engineering development.
Study, pre-design, evaluation and determination of costs of the private concession proposal to build and operate the plant, which will receive the sewage from the North Interceptor that collects the sewers of 27 districts of Lima.
-
- Flow of 14 m3/s.