Cerro Lindo Project
Ica
Final engineering and technical file. Geotechnical studies, topography, archeology and easement.
Supply of water and energy from the Jaguay beach desalination plant to the Cerro Lindo mining center.
- 3 pumping stations with 1200 HP pumps each. 22.9/4.2 kV substations.
- Water supply line: 50 km.
- Pumping height: 2200 m.
- Supply capacity: 2400 l/m.
- Power supply: 220/60/22.9 kV and 60/22.9 kV substations, 60kV (45 km) and 22.9 kV transmission lines.