The Farm Project

Cajamarca


Ultimate engineering. Development of tests to verify the quality of acid waters.

Flow and mass balance diagrams, P&ID and plant layout diagrams.

Service for Minera Río Tinto Peru.

Acid water conduction line from its capture in the tunnel to the storage reservoirs. Storage reservoirs of 950 m3 and 470 m3, with geomembrane protection. Water treatment plant for its conversion to neutral water, including treatment tanks, pumping systems and distribution pipes.