Pucallpa River Port

Loreto


Design, detail engineering and construction supervision (1982).

  • Port engineering work.
  • Floating dock made up of 5 steel pontoons.
  • Special 180 m double kink configuration.
  • Load capacity of 400,000 t/year.
  • River defense works.
  • Infrastructure and storage area of ​​48,000 m2.
  • Feasibility study (2003) to evaluate technically, economically, socially and environmentally the convenience of rehabilitating and modernizing the Pucallpa port terminal in its original location or relocating it to a suitable place, in such a way as to ensure its operability for most of the year.
  • Floating dock made up of 5 pontoons with a 180 m long slack.
  • Projected load capacity: 700,000 t/year. Infrastructure and storage area of ​​48,000 m2.