Yurimaguas River Port


Final design, detailed engineering and construction supervision (1981).

  • Floating dock with a steel structure 72 m long.
  • Loading capacity of 120,000 t/year.
  • River defense works.
  • Port infrastructure and storage area of ​​11,000 m2.

Relocation and rehabilitation project (1996) of the river terminal from the Paranapura River to the Huallaga River. Engineering study, review and evaluation of the state of the structures, rehabilitation of deteriorated structures and connection to existing facilities.