Morro Sama Fishing Port Stage 1

Tacna


Supervision of the work in the following stages:

    • Rockfill construction for breakwater with 2 sections of 63 and 160 mL.
    • Construction of a 4,214.39 m2 embankment with rockfill and granular pavement.
    • Construction of Dock No. 01 of reinforced concrete for boats (300 tN. max.)
    • Construction of Pier No. 02 for craft vessels.
    • Construction of port buildings (944 m2) of the modules: administrative, washing, refrigeration, elevated tank and cistern, oil and grease booth, and control booth.