Morro Sama Fishing Port Stage 1
Tacna
Supervision of the work in the following stages:
-
- Rockfill construction for breakwater with 2 sections of 63 and 160 mL.
- Construction of a 4,214.39 m2 embankment with rockfill and granular pavement.
- Construction of Dock No. 01 of reinforced concrete for boats (300 tN. max.)
- Construction of Pier No. 02 for craft vessels.
- Construction of port buildings (944 m2) of the modules: administrative, washing, refrigeration, elevated tank and cistern, oil and grease booth, and control booth.