Recovery of Liquid Hydrocarbons. lot 8
Definitive study and construction supervision. Project to carry out the environmental remediation of Lot 8, after almost 30 years of exploitation. Recovery of existing liquid hydrocarbons on the surface of the Yanayacu, Trompeteros and Corrientes lagoons.
Laboratory tests to define the possibility of its incorporation into the process at the Block 8 treatment plant or at the Iquitos refinery. Definition of the hydrocarbon recovery and elimination process by means of containment barriers and surface suction pumps (Skimmers), their storage in tanks and their incineration in special furnaces, with an ash recovery system to avoid contamination.